Huntley Street Mixed Use Development
Planning schematics · Ontario · Last reported Jul 2024
Source: Dodge USA
The development has a gross floor area of 77,266m with 76,253m of it being dedicated to residential space, and the remainder being devoted to a mix of retail, community space, and daycare. Would stand 48 and 59 storeys (163 and 195.35 metres tall respectively), on top of a shared 3-to 4-storey podium. The buildings would include a total of 1,297 units broken down into 275 studio (21.2%),178 one-be
- Status
- Prospective
- Sector
- Commercial, Road, Education, Residential, Cement
- Location
- Toronto, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Huntley Street Mixed Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development has a gross floor area of 77,266m with 76,253m of it being dedicated to residential space, and the remainder being devoted to a mix of retail, community space, and daycare. Would stand 48 and 59 storeys (163 and 195.35 metres tall respectively), on top of a shared 3-to 4-storey podium. The buildings would include a total of 1,297 units broken down into 275 studio (21.2%),178 one-bedroom (13.7%), 425 one-bedroom plus den (32.8%), 279 two-bedroom (21.5%), and 140 three-bedroom (... |
Budget |
Location
Country | Canada |
State | Ontario |
City | Toronto |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Education, Residential, Cement |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
