Hunts Road Embankment Improvements
Sector: Water Supply and Storage • Location: Andover, New Jersey, United States of America
Source: Dodge
PROPOSED EMBANKMENT IMPROVEMENTS ALONG HUNTS ROAD in the Township of Green. The principal items of work to be constructed along with their approximate quantities are as follows: Sawcutting: 128 Lin. Ft. Milling, 2 Thick: 1,220 Sq. Yd. Hot Mix Asphalt 9.5M64 Surface Course, 2 Thick: 170 Tons Traffic Stripes, Long Life Epoxy Resin, 4 Wide: 1,000 Lin. Ft. Steel Beam Guide Rail: 325 Lin. Ft. Precast C
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Steel, Mass Transit, Road, Commercial, Waste Processing and Treatment, Government, Rail, Metal, Manufacturing (Industrial)
- Location
- Andover, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hunts Road Embankment Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PROPOSED EMBANKMENT IMPROVEMENTS ALONG HUNTS ROAD in the Township of Green. The principal items of work to be constructed along with their approximate quantities are as follows: Sawcutting: 128 Lin. Ft. Milling, 2 Thick: 1,220 Sq. Yd. Hot Mix Asphalt 9.5M64 Surface Course, 2 Thick: 170 Tons Traffic Stripes, Long Life Epoxy Resin, 4 Wide: 1,000 Lin. Ft. Steel Beam Guide Rail: 325 Lin. Ft. Precast Concrete Block Retaining Wall: 555 Sq. Ft. Other Items |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Andover |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Steel, Mass Transit, Road, Commercial, Waste Processing and Treatment, Government, Rail, Metal, Manufacturing (Industrial) |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
