logo

Hura C OCP

Sector: Power Generation (CCGT) • Location: Godda, Jharkhand, India

Source: India Investment Grid (IIG)

Project
Notice To Proceed

Information Eastern Coal Fields Limited [ECL] has come up with Hura C OCP with a ticket size of 859.41 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project A project report of capacity 3 MTY was prepared in April 2005 by CMPDI,HQ, Ranchi and ECL Board in its 1

Project Information FAQ

Project Information

5 Q
The project “Hura C OCP” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Godda, Jharkhand, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

notice to proceed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Eastern Coal Fields Limited [ECL] has come up with Hura C OCP with a ticket size of 859.41 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project A project report of capacity 3 MTY was prepared in April 2005 by CMPDI,HQ, Ranchi and ECL Board in its 193rd meeting held on 18.04.2005 recommended the PR of Hura C OC and directed to send the PR to MoC for both options i.e total departmental option and total outsourcing option. On the guidelines of MoC vide letter dt 04.06.09, RI-I, CMPDI was asked to prepare UCE for approval by CIL Board as per the instant delegation of power. PR for Hura C OC was approved by CIL Board on 15.10.2015 with total capital investment of Rs 359.69 Crores in outsourcing mode. As outsourcing mode could not be successful due to non possession of land a PR in MDO mode was prepared. CIL Board in 445th meeting held on 10.08.2022 accorded its approval of PR for Hura C OC 3.0 MTY in MDO mode with capital investment of Rs 859.41 Crores [Existing-289.41 Crores, Additional 570.00 crores] by ECL. It is a Greenfield Project. Tender in MDO mode has been finalized and contract agreement has been signed on 22.11.2022 for Development and Operation of Hura C OCP. Mining activities/ access trench cutting started from 15.12.2022. Coal production started from 28.02.2023. EC: Obtained for 3 MTY on 11.06.2007 F.C: F.C , Stage-II for 260 Ha has been Granted vide F.No. 8-6/2009-FC, dated 21.05.2019. Target for coal production FY 22-23 was 0.50 MT, Achievement for FY 22-23 : 0.239 MT. Target for coal production FY 23-24 is 1.00 MT, Achievement for FY 23-24 till Jan-24 is 1.349 MT.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data