Husky Terminal Shore Power System
Sector: Seaport • Location: Tacoma, Washington, United States
Source: NWPB
Electrification of the Husky Terminal at the Port of Tacoma allowing vessels to plug into the power grid and turn off diesel engines while docked, reducing diesel emissions from ships.
- Status
- Closed
- Sector
- Seaport, Power Generation (CCGT), Government
- Location
- Tacoma, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- NWPB
ConstructChat
Ask ConstructChat about Husky Terminal Shore Power System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Electrification of the Husky Terminal at the Port of Tacoma allowing vessels to plug into the power grid and turn off diesel engines while docked, reducing diesel emissions from ships. |
Original sector | Port Infrastructure |
Location
Country | United States of America (USA) |
State | Washington |
City | Tacoma |
Source
Source | NWPB |
URL |
More Details
Record type | Project |
Sector | Seaport, Power Generation (CCGT), Government |
Article published date | 2025-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
