logo

Hut 8 AI Data Center in West Feliciana Parish

Sector: Water Supply and Storage • Location: Louisiana, United States

Source: Shreveport Times

Project
Planned

Hut 8 is building an AI data center in West Feliciana Parish, Louisiana, with two centers totaling approximately 450,000 square feet. The data center will use a closed-loop recirculating cooling system to minimize water consumption, initially requiring about 2.3 million gallons of water. Hut 8 is working with Entergy Louisiana to secure 330 MW of power with potential to increase utility capacity b

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Power Transmission, Data Center, Commercial
Location
Louisiana, United States of America
Updated
22 Jul 2026
Source
Shreveport Times

ConstructChat

Ask ConstructChat about Hut 8 AI Data Center in West Feliciana Parish

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hut 8 AI Data Center in West Feliciana Parish” is an infrastructure initiative in the Water Supply and Storage sector, located in Louisiana, United States. Taiyo aggregates data on it from Shreveport Times.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Hut 8 is building an AI data center in West Feliciana Parish, Louisiana, with two centers totaling approximately 450,000 square feet. The data center will use a closed-loop recirculating cooling system to minimize water consumption, initially requiring about 2.3 million gallons of water. Hut 8 is working with Entergy Louisiana to secure 330 MW of power with potential to increase utility capacity by 1,000 MW.

Original sector

Energy and Power Industry

Budget

Location

Country

United States of America (USA)

State

Louisiana

Source

Source

Shreveport Times

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Power Transmission, Data Center, Commercial

Article published date

2026-04-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project