logo
ProjectPre-Qualification

HVAC and Fuel Switching Upgrades

Pre-qualification · Ontario · Last reported Mar 2025

Source: Dodge

Prequalification of Contractors for HVAC and Fuel Switching Upgrades Project at Queen Frederica, City of Mississauga, Project 24559 The Project will include the following scope: Phased replacement of gas-fired Domestic Hot Water (DHW) heaters with a heat pump system with electric backup. Phased replacement of perimeter hydronic radiators and gas-fired boiler with fan coil units and a 2-pipe heat p

Status
Prospective
Sector
Water Supply and Storage, Government, Residential, Oil and Gas, Commercial, Power Generation (CCGT), Nuclear, Manufacturing (Industrial)
Location
Peel, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about HVAC and Fuel Switching Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “HVAC and Fuel Switching Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Peel, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-qualification

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Prequalification of Contractors for HVAC and Fuel Switching Upgrades Project at Queen Frederica, City of Mississauga, Project 24559 The Project will include the following scope: Phased replacement of gas-fired Domestic Hot Water (DHW) heaters with a heat pump system with electric backup. Phased replacement of perimeter hydronic radiators and gas-fired boiler with fan coil units and a 2-pipe heat pump chilled/hot water system with electric boiler heating backup . Installation of risers for hyd...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Peel

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Residential, Oil and Gas, Commercial, Power Generation (CCGT), Nuclear, Manufacturing (Industrial)

Article published date

2025-03-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project