HVAC Units & VAV Boxes Removal & Replacement
Closed · Virginia · Last reported Mar 2024
Source: Dodge USA
SCOPE OF WORK The purpose of this Invitation for Bids is to engage a contractor to: a) Remove and dispose of two (2) HVAC units, then furnish and install two (2) new and unused Trane Self-Contained Water-Cooled HVAC Systems, or other manufacturer s equivalent equipment. Fabrication and installation of sheet metal ducting for Tie-In. Insulation of new ducting. Installation of new water piping conne
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Government, Commercial, Waste Processing and Treatment
- Location
- Abingdon, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about HVAC Units & VAV Boxes Removal & Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK The purpose of this Invitation for Bids is to engage a contractor to: a) Remove and dispose of two (2) HVAC units, then furnish and install two (2) new and unused Trane Self-Contained Water-Cooled HVAC Systems, or other manufacturer s equivalent equipment. Fabrication and installation of sheet metal ducting for Tie-In. Insulation of new ducting. Installation of new water piping connecting systems to cooling tower loop. Installation of electrical line voltage to new systems. Inst... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Abingdon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
