HVAC Upgrades at Wilmot Administration Complex
Completed · Ontario
Source: Infrastructure Canada
This project will design the specifications for and replace HVAC equipment at an administration complex in Wilmot, Ontario. The replaced equipment will include the boiler and related pumps, cooling tower system and glycol top up, heat recovery ventilators, heat pumps, split air conditioning units and the roof-top, make-up air unit. A building automation system will also be installed to control and
- Status
- Closed
- Sector
- Commercial, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about HVAC Upgrades at Wilmot Administration Complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will design the specifications for and replace HVAC equipment at an administration complex in Wilmot, Ontario. The replaced equipment will include the boiler and related pumps, cooling tower system and glycol top up, heat recovery ventilators, heat pumps, split air conditioning units and the roof-top, make-up air unit. A building automation system will also be installed to control and manage all equipment. |
Original sector | Ventilation Systems |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
