HWY 38 Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
SFRFP 240030, Highway 38 Bridge Replacement over Duck Creek Saskatchewan Ministry of Highways is planning to replace the existing bridge on Highway No. 38 over Duck Creek, C.S. 38-05, km 27.27, South of Kelvington, Saskatchewan with a new bridge in Winter 2024 or in 2025. The Ministry requires the site inspection services and construction administration during construction for this project.
- Status
- Under Construction
- Sector
- Bridge, Road, Government, Commercial
- Location
- Regina, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about HWY 38 Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SFRFP 240030, Highway 38 Bridge Replacement over Duck Creek Saskatchewan Ministry of Highways is planning to replace the existing bridge on Highway No. 38 over Duck Creek, C.S. 38-05, km 27.27, South of Kelvington, Saskatchewan with a new bridge in Winter 2024 or in 2025. The Ministry requires the site inspection services and construction administration during construction for this project. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Regina |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Aqsarniit Hotel and Convention Centre
- Toronto Airport Piers D and E Fixed Bridges
- British Columbia Swartz Bay and Tsawwassen Ferry Terminals
- Viva Magnetics Plant
- Sheffield Bridge Tri-Municipal Project
- Nisichawayasihk Cree Nation (NCN) Road Paving Project Phase 2
- Rosenort Industrial Park Road Extension
- Paving of Oak River Roads
