Hwy 39 - Roadwork & Surfacing Structure
Sector: Cement • Location: Saskatchewan, Canada
Source: Dodge USA
Construction of a surfacing structure on highway no. 39-01-40 (roche percee access), 800 metres south of its junction with highway no. 39 to 3.5 km south; for a total of 2 857 tonnes. Asphalt Concrete In Place, Contractor Supply: 2 857 t
- Status
- Closed
- Sector
- Cement, Road, Commercial
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hwy 39 - Roadwork & Surfacing Structure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a surfacing structure on highway no. 39-01-40 (roche percee access), 800 metres south of its junction with highway no. 39 to 3.5 km south; for a total of 2 857 tonnes. Asphalt Concrete In Place, Contractor Supply: 2 857 t |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Saskatchewan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
- Kearl Ore Preparation Plant
- Molson Brewery Expansion
- Air Products Hydrogen Plant Civil Construction
- McMath Secondary School
