Hwy 55 Booster Pump Station Upgrades
Sector: Water Supply and Storage • Location: Apex, North Carolina, United States of America
Source: Dodge USA
This project will enhance the booster pump station that is effective for transferring in water from Holly Springs into Apex in case of emergency shortages. The current pump station is designed for 1.1 Million Gallons a Day (MGD) of flow but will need to be upsized to handle 4.6 MGD.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment
- Location
- Apex, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hwy 55 Booster Pump Station Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will enhance the booster pump station that is effective for transferring in water from Holly Springs into Apex in case of emergency shortages. The current pump station is designed for 1.1 Million Gallons a Day (MGD) of flow but will need to be upsized to handle 4.6 MGD. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Apex |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment |
Article published date | 2023-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
