Hwy 69/169 Roundabout Waterline Relocation
Sector: Water Supply and Storage • Location: Prescott Valley, Arizona, United States of America
Source: Dodge USA
the work consists of site preparations in ADOT right of way at Hwy 69 and 169 in Prescott Valley, Arizona; removal of an existing manhole, installation of 24-inch sewer casing sleeve; Installation of 200 lf of 8-inch sanitary sewer main and two manholes; installation of 24-inch water casing sleeve; installation of 220 lf of 8-inch water main; installation of 400 lf of 12-inch water main; testing o
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial
- Location
- Prescott Valley, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hwy 69/169 Roundabout Waterline Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the work consists of site preparations in ADOT right of way at Hwy 69 and 169 in Prescott Valley, Arizona; removal of an existing manhole, installation of 24-inch sewer casing sleeve; Installation of 200 lf of 8-inch sanitary sewer main and two manholes; installation of 24-inch water casing sleeve; installation of 220 lf of 8-inch water main; installation of 400 lf of 12-inch water main; testing of new sewer and water mains; removal of existing 12-inch water main and valves, and site restoration |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Prescott Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
