Hwy 7 Waterline Replacement
Sector: Water Supply and Storage • Location: Sulphur, Oklahoma, United States of America
Source: Dodge
The replacement of existing 3 water main with a new 8 PVC C900 DR 18 water main that will connect to an existing 8 along State Highway 7 from County Road 110 on the west end of Chickasaw Trail Road on the east end. 1 10,130.00 L.F. 8" PVC C900 DR 18 Water Main 2 380.00 L.F. Directional Bore & Install 14" PE SDR 11 Casing 3 380.00 L.F. Install 8" PE SDR 11 Water Main 4 8.00 Ea. PVC to PE Transition
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government, Steel, Metal
- Location
- Sulphur, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hwy 7 Waterline Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The replacement of existing 3 water main with a new 8 PVC C900 DR 18 water main that will connect to an existing 8 along State Highway 7 from County Road 110 on the west end of Chickasaw Trail Road on the east end. 1 10,130.00 L.F. 8" PVC C900 DR 18 Water Main 2 380.00 L.F. Directional Bore & Install 14" PE SDR 11 Casing 3 380.00 L.F. Install 8" PE SDR 11 Water Main 4 8.00 Ea. PVC to PE Transition 5 45.00 L.F. Bore & Install 14" Steel Casing, 0.188" Thick 6 1.00 Ea. 3" Interconnection 7 2.00 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Sulphur |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government, Steel, Metal |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
