Hwy 7A Pavement and Structural Rehabilitation
Sector: Road • Location: Toronto, Ontario, Canada
Source: Dodge USA
This assignment includes detail design and contract preparation for the rehabilitation of Highway 7A from Durham Road 57 North Junction to Nesbitt Line Road, and the rehabilitation of one (1) structural culvert (East Cross Creek Culvert, 21X-0014/C0).
- Status
- Prospective
- Sector
- Road, Commercial, Government, Manufacturing (Industrial)
- Location
- Toronto, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hwy 7A Pavement and Structural Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This assignment includes detail design and contract preparation for the rehabilitation of Highway 7A from Durham Road 57 North Junction to Nesbitt Line Road, and the rehabilitation of one (1) structural culvert (East Cross Creek Culvert, 21X-0014/C0). |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Toronto |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
