logo

Hybrid Concentrating Solar Thermal Systems

Sector: Cement • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The Hybrid Concentrating Solar Thermal Systems project demonstrated the successful design, integration and operation of a high temperature solar heat (150 to 200 degrees Celsius) building space heating and cooling system, and provided a pathway for realising a world first high efficiency solar thermal desiccant air conditioning system.Key resultsIntegration cost of concentrating collectors for roo

Project Information FAQ

Project Information

5 Q
The project “Hybrid Concentrating Solar Thermal Systems” is an infrastructure initiative in the Cement sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Hybrid Concentrating Solar Thermal Systems project demonstrated the successful design, integration and operation of a high temperature solar heat (150 to 200 degrees Celsius) building space heating and cooling system, and provided a pathway for realising a world first high efficiency solar thermal desiccant air conditioning system.Key resultsIntegration cost of concentrating collectors for rooftop installationsInstallation of trough collectors and the desiccant air conditioner prototype on the roof required adding super structures to the roof to distribute the load onto the existing concrete columns in the roof. Structural consultants were brought in to resolve this problem. This resulted in additional project cost and time.Remote site installation and monitoringHeating, ventilating, and air conditioning (HVAC) tradespeople do not have expertise in emerging technologies such as desiccant systems and indirect evaporative coolers. This meant that CSIRO engineers needed to visit the site for initial troubleshooting more often than originally planned. This resulted in additional project cost and time.Hybrid concentrating solar thermal systems for large scale applicationsCSIRO’s desiccant air conditioning system prototype is between TRL3 and TRL4 and has not been built before. As a result, when HVAC contractors were asked to quote for building a prototype, they built significant costs for ‘unknown’ risks in their quotes. It is recommended that projects include a substantial contingency margin when budgeting for building prototypes that are at early TRL levels (less than TRL5) and requiring a client site installation. This margin should be facilitated by the project financier.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data