logo
ProjectEnded

Hybrid Energy Storage System

Ended · Spain

Source: EU Funding & Tenders Portal

The development of solutions with the capability of efficiently managing the energy produced by renewable sources and providing fast response as a back-up system or for frequency regulation is a major need in the energy market. While the former has been traditionally satisfied by using batteries, the latter is mainly covered by fossil fuel dependent technologies. Batteries allow for a significant

Status
Closed
Sector
Natural Gas, Wind, Energy Storage, Power Generation (CCGT)
Location
Spain
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Hybrid Energy Storage System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Hybrid Energy Storage System” is an infrastructure initiative in the Natural Gas sector, located in Spain. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development of solutions with the capability of efficiently managing the energy produced by renewable sources and providing fast response as a back-up system or for frequency regulation is a major need in the energy market. While the former has been traditionally satisfied by using batteries, the latter is mainly covered by fossil fuel dependent technologies. Batteries allow for a significant increase of penetration of stochastic renewable energy sources but are unable to satisfy transient events requiring high power responses. In the case of fossil fuel technologies, a set of well-known drawbacks (high operation costs, fuel dependency, pollution and power supply instability, etc.) shows that these solutions are not the most suitable ones from economic and environmental perspectives. In order to overcome this situation, Wind Inertia proposes HESS, a hybrid storage solution that integrates in a single system, ultracapacitors’ (UC) high power density and robustness, Li-ion batteries’ energy storage density, advanced power electronics and control and management systems. The result is a solution capable of combining and optimizing the use of multiple types of energy resources (renewable, fossil fuel dependent and storage). The expected outcome of this proposal is the elaboration of a feasibility study and a business plan aiming at verifying the technological, practical and economic viability of the technology describing their most suitable business model, exploitation strategy, etc.

Location

Country

Spain

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Natural Gas, Wind, Energy Storage, Power Generation (CCGT)

Article published date

2026-01-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project