logo

Hybrid Solar-Plus-Storage Project at Cocoa Plant in Cameroon

Sector: Solar • Location: Kekem, Cameroon

Source: Renewables Now

Project
Under Construction

Norway-based and Africa-focused solar developer and impact investor Empower New Energy announced its first investment in Cameroon, a solar-plus-storage project implemented for local cocoa processor Neo Industry SA. Construction works have been launched on the hybrid site in Kekem, which will accommodate a 1.8-MWp rooftop solar system and a 2.5-MWh battery. The plant is expected to produce about 2,

Project Information FAQ

Project Information

3 Q
The project “Hybrid Solar-Plus-Storage Project at Cocoa Plant in Cameroon” is an infrastructure initiative in the Solar sector, located in Kekem, Cameroon. Taiyo aggregates data on it from Renewables Now.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Norway-based and Africa-focused solar developer and impact investor Empower New Energy announced its first investment in Cameroon, a solar-plus-storage project implemented for local cocoa processor Neo Industry SA. Construction works have been launched on the hybrid site in Kekem, which will accommodate a 1.8-MWp rooftop solar system and a 2.5-MWh battery. The plant is expected to produce about 2,270 MWh of clean electricity annually upon commissioning to support Neo’s cocoa processing operations. The installation is developed and executed by Eclipse Energies Renouvelables. The project is backed by a 25-year power support agreement under which Empower will finance, build and operate the plant. The project aims to reduce Neo’s reliance on grid and diesel generation, promote self-consumption of renewable energy, lower energy and operational costs, ensure energy security and cut the company’s CO2 emissions.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data