Hyder Energy Center Project Phase I 400MW
Planning schematics · Arizona · Last reported Jul 2024
Source: Dodge USA
800 megawatts of electricity along with a battery energy system storing and discharging up to 3.2 gigawatt hours; 37 private parcels in five non-contiguous areas; 1.997 acres; Generally located between the Yuma County Line to the west, 555th Ave. to the east, Old Agua Caliente Rd. to the south, and Butterfield Stage Rd. to the north
- Status
- Prospective
- Sector
- Water Supply and Storage, Energy Storage, Power Generation (CCGT), Commercial, Residential
- Location
- Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hyder Energy Center Project Phase I 400MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 800 megawatts of electricity along with a battery energy system storing and discharging up to 3.2 gigawatt hours; 37 private parcels in five non-contiguous areas; 1.997 acres; Generally located between the Yuma County Line to the west, 555th Ave. to the east, Old Agua Caliente Rd. to the south, and Butterfield Stage Rd. to the north |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Energy Storage, Power Generation (CCGT), Commercial, Residential |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
