logo

HYDRO POWER

Sector: Bridge • Location: Sri Lanka

Source: World Bank Group

Project
Closed

The Norton Bridge Hydro and Second Grandpass Thermal Power Project will provide the Government of Ceylon a loan to finance the foreign exchange cost of an expansion of the power system operated by the Department of Government Electrical Undertaking (DGEU). The project consists of the construction of a 50 MW hydro plant at Norton Bridge, a second 25 MW thermal unit at Grandpass, and additional tran

Status
Closed
Sector
Bridge, Hydro, Geothermal, Power Generation (CCGT), Government, Commercial
Location
Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about HYDRO POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “HYDRO POWER” is an infrastructure initiative in the Bridge sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Norton Bridge Hydro and Second Grandpass Thermal Power Project will provide the Government of Ceylon a loan to finance the foreign exchange cost of an expansion of the power system operated by the Department of Government Electrical Undertaking (DGEU). The project consists of the construction of a 50 MW hydro plant at Norton Bridge, a second 25 MW thermal unit at Grandpass, and additional transmission and distribution facilities. The proposed hydro plant will produce cheaper power, which is needed at this time to prevent an immediate shortage of capacity. The total system capacity after completion of these plants will be sufficient to meet the demand until the latter part of 1966, although some shortage might occur before the thermal plant could be put into operation. It is essential that further consideration to be started in 1963 in order that the required new capacity be available by 1966. The present organization of the DGEU is not satisfactory and the rules and regulations are not suitable for commercial operations. Legislation providing for the establishment of an autonomous Electricity Board has been prepared by the government. Many of the organizational defects of the DGEU will be cured by the establishment of the Board.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Sri Lanka

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Bridge, Hydro, Geothermal, Power Generation (CCGT), Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project