logo

Hydrodynamic and Water Quality Modeling of Lake Roosevelt

Sector: Advanced Electronics • Location: United States of America

Source: Grants.gov

Project
Archived

Water temperature and total dissolved gas (TDG) in the Columbia River is strongly influenced by the storage and release of water from projects like Grand Coulee Dam. Previous work has produced a temperature model (CE-QUAL-W2) of Lake Roosevelt for the purpose of informing in-season watershed management decisions to reduce take and to allow the evaluation of various operational and structural alte

Project Information FAQ

Project Information

5 Q
The project “Hydrodynamic and Water Quality Modeling of Lake Roosevelt” is an infrastructure initiative in the Advanced Electronics sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Water temperature and total dissolved gas (TDG) in the Columbia River is strongly influenced by the storage and release of water from projects like Grand Coulee Dam. Previous work has produced a temperature model (CE-QUAL-W2) of Lake Roosevelt for the purpose of informing in-season watershed management decisions to reduce take and to allow the evaluation of various operational and structural alternatives that can influence the regulation of water flow and temperature. The purpose of this project is to update the aforementioned Lake Roosevelt CE-QUAL-W2 model to also simulate TDG. This data may then be used as input to downstream Columbia River System water quality models. This capability is to assist in real-time decision making, and investigate alternatives to reduce total mass loading of TDG at Bonneville Dam while maintaining juvenile survival performance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data