Hydroelectric Plants on Indus System
Sector: Government • Location: Jammu & Kashmir, India
Source: The Economic Times
Acceleration of work on several hydroelectric plants including Pakal Dul (1,000 MW), Ratle (850 MW), Kiru (624 MW), and Kwar (540 MW) to better utilize India's share of the Indus river system.
- Status
- Under Construction
- Sector
- Government, Residential, Water Supply and Storage, Power Generation (CCGT)
- Location
- Jammu & Kashmir, India
- Updated
- 22 Jul 2026
- Source
- The Economic Times
ConstructChat
Ask ConstructChat about Hydroelectric Plants on Indus System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Acceleration of work on several hydroelectric plants including Pakal Dul (1,000 MW), Ratle (850 MW), Kiru (624 MW), and Kwar (540 MW) to better utilize India's share of the Indus river system. |
Original sector | Energy |
Location
Country | India |
State | Jammu & Kashmir |
Source
Source | The Economic Times |
URL |
More Details
Record type | Project |
Sector | Government, Residential, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2025-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
