logo
ProjectCancelled

Hydropower Evacuation Scheme

Cancelled · Himachal Pradesh · Last reported Mar 2025

Source: T&D India

The project involves the establishment of an interstate transmission system (ISTS) for the evacuation of power from the upcoming Shongtong Karcham (450 MW) and Tidong (150 MW) hydropower projects in Himachal Pradesh. The bidding process for this scheme has been annulled by RECPDCL after multiple extensions and delays.

Status
Closed
Sector
Hydro, Power Generation (CCGT), Road
Location
Himachal Pradesh, India
Updated
22 Jul 2026
Source
T&D India

ConstructChat

Ask ConstructChat about Hydropower Evacuation Scheme

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Hydropower Evacuation Scheme” is an infrastructure initiative in the Hydro sector, located in Himachal Pradesh, India. Taiyo aggregates data on it from T&D India.

Participants

Not available for this record.

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the establishment of an interstate transmission system (ISTS) for the evacuation of power from the upcoming Shongtong Karcham (450 MW) and Tidong (150 MW) hydropower projects in Himachal Pradesh. The bidding process for this scheme has been annulled by RECPDCL after multiple extensions and delays.

Original sector

Energy

Location

Country

India

State

Himachal Pradesh

Source

Source

T&D India

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Road

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project