logo

HYDROPOWER REHAB & SYST CNTRL

Sector: Water Supply and Storage • Location: Ukraine

Source: World Bank Group

Project
Closed

The objectives of the Hydropower Rehabilitation and System Control Project are to: a) improve the efficiency, reliability, safety and environmental performance of hydropower plants; b) increase hydropower generation capacity; c) improve the quality of electricity supply by upgrading load and frequency control; and d) reduce fuel costs by facilitating the economic dispatch of generating units. The

Project Information FAQ

Project Information

5 Q
The project “HYDROPOWER REHAB & SYST CNTRL” is an infrastructure initiative in the Water Supply and Storage sector, located in Ukraine. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the Hydropower Rehabilitation and System Control Project are to: a) improve the efficiency, reliability, safety and environmental performance of hydropower plants; b) increase hydropower generation capacity; c) improve the quality of electricity supply by upgrading load and frequency control; and d) reduce fuel costs by facilitating the economic dispatch of generating units. The project includes the following components: 1) implementation of the complete rehabilitation program for the Dnieper I and II hydropower plants and the Kiev pump storage plant (PSP); near-complete implementation of the rehabilitation program for the Kakhovka hydropower station (HPS); and partial implementation of the rehabilitation program for the Kiev, Kanev, Kremenchug and Dniprodzerzhinsk hydropower plants; 2) installation of dam safety monitoring systems at the main water reservoirs on the Dnieper river; 3) upgrade of communications, dispatch, system control and protection, and generating unit control; and 4) technical assistance for project implementation, and optimization of the use of the reservoirs on the Dnieper river.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data