logo
ProjectOngoing

Hyper powered vessel battery charging system

Ongoing · Spain, Netherlands, Italy, Belgium, Türkiye, France, Greece, Germany, Poland

Source: EU Funding & Tenders Portal

As a significant source of greenhouse gasses (GHGs), it is essential that the maritime transport sector focuses on ways to become climate neutral. Partial electrification of power systems has already been adopted as a GHG reduction measure. However, further advances are necessary on such aspects as the provision of high charging powers to minimise costs and improve standardisation. In this context

Status
Under Construction
Sector
Advanced Electronics, Energy Storage, Seaport, Automotive, Warehouse, Power Generation (CCGT)
Location
Spain
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Hyper powered vessel battery charging system

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Hyper powered vessel battery charging system” is an infrastructure initiative in the Advanced Electronics sector, located in Spain, Netherlands, Italy, Belgium, Türkiye, France, Greece, Germany, Poland. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

As a significant source of greenhouse gasses (GHGs), it is essential that the maritime transport sector focuses on ways to become climate neutral. Partial electrification of power systems has already been adopted as a GHG reduction measure. However, further advances are necessary on such aspects as the provision of high charging powers to minimise costs and improve standardisation. In this context, HYPOBATT will be focused on the development of an interoperable charging solution with a cost-competitive performance. HYPOBATT will deliver a modular, fast, and easy multi-MW recharging system demonstrated in two European ports with fast turnaround times. The project will assess the end-to-end services between both ports, and compatibility with other ports. A modular approach on electrical and mechanical integration will minimize the required connection time, the charging time, land from port side and the number of components and costs. The charging system will be designed to achieve interoperability and compatibility with different electric ships, grid constraints, components, modularity, logistic and handling, monitoring and safety systems, power flow, maintenance, digitalization/automation, cybersecurity, and human element aspects. The standardization of the charging modules, the interfaces, and the communication protocol, will scale up the charger based on and on/offshore sides; flexibility of power levels will be addressed and the impacts on the electrical grid infrastructure and on the battery degradation during fast charging will be minimized. HYPOBATT unites key actors from the European maritime sector to develop and demonstrate the charging system. A key element is to develop business mechanisms to exploit the flexibility of the charging system amongst shipbuilders, integrators, ports and stakeholders. This will enable the wide adoption of the solution, thus increasing Europe’s lead in fast charging systems.

Location

Country

Spain

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Advanced Electronics, Energy Storage, Seaport, Automotive, Warehouse, Power Generation (CCGT)

Article published date

2025-10-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project