logo

I-10 at SR 95 (US 29) Interchange

Sector: Consumer Products • Location: Pensacola, Florida, United States Of America (USA)

Source: Florida Department of Transportation (FDOT)

Project
Construction

This project reconstructs the interchange to address future capacity, operations, and safety issues. Major project components include. 1) Construct six new mainline lanes on I-10 through the center of the interchange (requires 6 bridges) 2) Convert existing I-10 mainline bridges to serve as proposed ramps. 3) Remove the eastbound I-10 mainline bridges to serve as proposed ramps. 4) Construct exten

Project Information FAQ

Project Information

4 Q
The project “I-10 at SR 95 (US 29) Interchange” is an infrastructure initiative in the Consumer Products sector, located in Pensacola, Florida, United States Of America (USA). Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project reconstructs the interchange to address future capacity, operations, and safety issues. Major project components include. 1) Construct six new mainline lanes on I-10 through the center of the interchange (requires 6 bridges) 2) Convert existing I-10 mainline bridges to serve as proposed ramps. 3) Remove the eastbound I-10 mainline bridges to serve as proposed ramps. 4) Construct extended two-lane ramps east of the interchange. 5) Replace the existing North Palafox Street and CSX bridges to provide room for the extended ramps on I-10 6) Modify the intersection of Diamond Dairy Road at US 29 to allow access to the eastbound and westbound I-10 ramps from Diamond Dairy Road. 7) Construct stormwater ponds. Design: Complete - Right of Way: Ongoing (FY 2021-2023) - Construction: Letting in June 2023

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data