I-10 from west of Avalon Boulevard to east of SR 85 - PD&E/Design
Sector: Road • Location: Milton, Crestview, Florida, United States Of America (USA)
Source: Florida Department of Transportation (FDOT)
FDOT is conducting two Project Development and Environment (PD&E) studies to analyze the existing characteristics, evaluate the community needs and impacts, and develop proposed conceptual improvements for two adjacent I-10 segments. These segments are:I-10 from west of SR 281 (Avalon Boulevard) to west of CR 189 (Log Lake Road) in Santa Rosa and Okaloosa CountiesFPID 413062-4-22-01 & 413062-5-22-
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pd&e |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | FDOT is conducting two Project Development and Environment (PD&E) studies to analyze the existing characteristics, evaluate the community needs and impacts, and develop proposed conceptual improvements for two adjacent I-10 segments. These segments are:I-10 from west of SR 281 (Avalon Boulevard) to west of CR 189 (Log Lake Road) in Santa Rosa and Okaloosa CountiesFPID 413062-4-22-01 & 413062-5-22-01This study will evaluate adding capacity on I-10 by widening the roadway from four to six lanes from east of Avalon Boulevard to the Okaloosa County line in Santa Rosa County and from the Santa Rosa County line to west of Log Lake Road in Okaloosa County. The total distance of this study is approximately 24 miles. Interchange improvements will be evaluated as necessary. I-10 from west of CR 189 (Log Lake Road) to east of SR 85(Ferdon Boulevard) in Okaloosa CountyFPID 441038-1-22-01This study will evaluate adding capacity on I-10 by widening the roadway from four to six lanes from west of Log Lake Road to east of SR 85 in Okaloosa County. The total distance of this study is approximately 11.5 miles. Interchange improvements will be evaluated as necessary. FDOT is collecting and studying data to help compare the project alternatives. A virtual (online) project update and public hearing will be held to provide interested persons the most current information on the project(s) and allow additional opportunities for public input.Virtual Public Update - Tuesday, Feb. 22, 2022. Hybrid Public Meeting - Tuesday, March 15, 2022.I-10 from west of SR 281 (Avalon Boulevard) to west of CR 189 (Log Lake Road) in Santa Rosa and Okaloosa CountiesAlan Vann, FDOT Project Manager | 850-330-1523 | alan.vann@dot.state.fl.usI-10 from west of Log Lake Road to east of SR 85 (Ferdon Boulevard) in Okaloosa CountyTori White, FDOT Project Manager | 850-330-1455 | tori.white@dot.state.fl.us |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
