logo

I-10 Resurfacing from West of CR 250 to SR 121

Sector: Road • Location: Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

This project consists of milling and resurfacing of three sections of I-10, stretching from west of County Road 250 to State Road 121. The following sections are under construction: Over 4.3 miles of I-10, stretching from west of County Road 250 to the Columbia/Baker County line. Traffic will be maintained in accordance with FDOT design standards throughout this project. Monday through Thursday, d

Project Information FAQ

Project Information

5 Q
The project “I-10 Resurfacing from West of CR 250 to SR 121” is an infrastructure initiative in the Road sector, located in Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of milling and resurfacing of three sections of I-10, stretching from west of County Road 250 to State Road 121. The following sections are under construction: Over 4.3 miles of I-10, stretching from west of County Road 250 to the Columbia/Baker County line. Traffic will be maintained in accordance with FDOT design standards throughout this project. Monday through Thursday, drivers can expect no single lane closures between 6 a.m. and 9 p.m. No lane closures will be allowed 6 a.m. Friday through 9 p.m. on Sunday. Almost 9 miles of I-10, from the Columbia County line to U.S. 90. Additionally, this project will include resurfacing of the eastbound and westbound Baker County I-10 rest areas.Traffic will be maintained in accordance with FDOT design standards throughout this project. Drivers can expect no single lane closures between 6 a.m. and 9 p.m. Monday through Friday and no detours between 5 a.m. and midnight Monday through Friday. No lane closures or detours will be allowed 6 a.m. Friday through 9 p.m. Sunday. Approximately 11.5 miles of I-10 from U.S. 90 to State Road 121. Traffic will be maintained in accordance with FDOT design standards throughout this project. I-10: No single lane closures will be allowed 6 a.m. to 9 p.m. Monday through Thursday. No detours will be allowed 5 a.m. to 12 a.m. Monday through Friday. No lane closures or detours will be allowed 6 a.m. Friday through 9 p.m. Sunday. US 90, CR 229 and CR 125: No lane closures from 6 a.m. to 9 a.m. Monday through Friday.Anderson Columbia, Co. is expected to complete this project by spring 2024, weather and unforeseen circumstances permitting.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data