I-10 Widening West Closures Phase 1 and Phase 2
Sector: Road • Location: El Paso, Texas, United States
Source: KFOX
The project involves widening the I-10 highway westbound with lane closures and full closures for traffic switches and striping repairs. Phase 1 includes alternate lane closures between Vinton and Resler with crews working on finishing touches. Phase 2 includes a 33-hour full closure of I-10 westbound between Los Mochis and Antonio for a westbound traffic switch and a full closure of I-10 eastboun
- Status
- Under Construction
- Sector
- Road
- Location
- El Paso, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- KFOX
ConstructChat
Ask ConstructChat about I-10 Widening West Closures Phase 1 and Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves widening the I-10 highway westbound with lane closures and full closures for traffic switches and striping repairs. Phase 1 includes alternate lane closures between Vinton and Resler with crews working on finishing touches. Phase 2 includes a 33-hour full closure of I-10 westbound between Los Mochis and Antonio for a westbound traffic switch and a full closure of I-10 eastbound at Anthony for striping repairs. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Texas |
City | El Paso |
Source
Source | KFOX |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
