I-15 Smart Freeway Project
Sector: Road • Location: Temecula and Murrieta, California, United States
Source: MyNewsLA
A $33 million pilot project aimed at improving highway traffic flow within the Interstate 15 corridor in Riverside County, California. The project will deploy ramp meters at key locations during peak hours to improve freeway travel times through a coordinated system that adjusts in real time. The project will operate for two years from the San Diego/Riverside County line in Temecula to the 15/215
- Status
- Prospective
- Sector
- Road
- Location
- Temecula and Murrieta, California, United States of America
- Updated
- 22 Jul 2026
- Source
- MyNewsLA
ConstructChat
Ask ConstructChat about I-15 Smart Freeway Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $33 million pilot project aimed at improving highway traffic flow within the Interstate 15 corridor in Riverside County, California. The project will deploy ramp meters at key locations during peak hours to improve freeway travel times through a coordinated system that adjusts in real time. The project will operate for two years from the San Diego/Riverside County line in Temecula to the 15/215 interchange in Murrieta. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Temecula and Murrieta |
Source
Source | MyNewsLA |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
