logo

I-16 @ CR 310/OLD RIVER RD-INTERCHANGE; INC WIDENING OLD RVR

Sector: Commercial • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Proposed project will widen and improve the I-16/Old River Rd interchange. The project proposes to widen the existing two-lane roadway and bridge on Old River Rd to a four-lane divided highway with a 20' raised median. Left-turn lanes and right-turn lanes (12' wide) would be provided at major intersections and major commercial drives. The roadway would have 10' rural shoulders on both sides (6.5'

Project Information FAQ

Project Information

4 Q
The project “I-16 @ CR 310/OLD RIVER RD-INTERCHANGE; INC WIDENING OLD RVR” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Proposed project will widen and improve the I-16/Old River Rd interchange. The project proposes to widen the existing two-lane roadway and bridge on Old River Rd to a four-lane divided highway with a 20' raised median. Left-turn lanes and right-turn lanes (12' wide) would be provided at major intersections and major commercial drives. The roadway would have 10' rural shoulders on both sides (6.5' paved with a 2'rumble strip adjacent to the edge of travel lane). The interchange at I-16 would remain a diamond interchange; however, the ramps would be reconstructed to meet the geometric design speed of 45 mph. The reconstructed 16' wide off-ramps would be widened to provide two 12' left-turn lanes and one 12' right-turn lane on the eastbound ramp approach to Old River Rd. The westbound ramp approach to Old River Rd would have two 12' left-turn lanes and two 12' right-turn lanes. Total length=0.27 mile. Scheduled Management Let Date=7-18.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data