I-16 @ CR 310/OLD RIVER RD-INTERCHANGE; INC WIDENING OLD RVR
Sector: Commercial • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Proposed project will widen and improve the I-16/Old River Rd interchange. The project proposes to widen the existing two-lane roadway and bridge on Old River Rd to a four-lane divided highway with a 20' raised median. Left-turn lanes and right-turn lanes (12' wide) would be provided at major intersections and major commercial drives. The roadway would have 10' rural shoulders on both sides (6.5'
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Proposed project will widen and improve the I-16/Old River Rd interchange. The project proposes to widen the existing two-lane roadway and bridge on Old River Rd to a four-lane divided highway with a 20' raised median. Left-turn lanes and right-turn lanes (12' wide) would be provided at major intersections and major commercial drives. The roadway would have 10' rural shoulders on both sides (6.5' paved with a 2'rumble strip adjacent to the edge of travel lane). The interchange at I-16 would remain a diamond interchange; however, the ramps would be reconstructed to meet the geometric design speed of 45 mph. The reconstructed 16' wide off-ramps would be widened to provide two 12' left-turn lanes and one 12' right-turn lane on the eastbound ramp approach to Old River Rd. The westbound ramp approach to Old River Rd would have two 12' left-turn lanes and two 12' right-turn lanes. Total length=0.27 mile. Scheduled Management Let Date=7-18. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
