logo
ProjectComplete

I-16 @ CR 310/OLD RIVER RD-INTERCHANGE; INC WIDENING OLD RVR

Complete · Georgia

Source: Georgia Department of Transportation (GDOT)

Proposed project will widen and improve the I-16/Old River Rd interchange. The project proposes to widen the existing two-lane roadway and bridge on Old River Rd to a four-lane divided highway with a 20' raised median. Left-turn lanes and right-turn lanes (12' wide) would be provided at major intersections and major commercial drives. The roadway would have 10' rural shoulders on both sides (6.5'

Status
Closed
Sector
Commercial, Bridge, Road, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about I-16 @ CR 310/OLD RIVER RD-INTERCHANGE; INC WIDENING OLD RVR

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-16 @ CR 310/OLD RIVER RD-INTERCHANGE; INC WIDENING OLD RVR” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposed project will widen and improve the I-16/Old River Rd interchange. The project proposes to widen the existing two-lane roadway and bridge on Old River Rd to a four-lane divided highway with a 20' raised median. Left-turn lanes and right-turn lanes (12' wide) would be provided at major intersections and major commercial drives. The roadway would have 10' rural shoulders on both sides (6.5' paved with a 2'rumble strip adjacent to the edge of travel lane). The interchange at I-16 would remain a diamond interchange; however, the ramps would be reconstructed to meet the geometric design speed of 45 mph. The reconstructed 16' wide off-ramps would be widened to provide two 12' left-turn lanes and one 12' right-turn lane on the eastbound ramp approach to Old River Rd. The westbound ramp approach to Old River Rd would have two 12' left-turn lanes and two 12' right-turn lanes. Total length=0.27 mile. Scheduled Management Let Date=7-18.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Commercial, Bridge, Road, Government

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project