logo

I-16 EB & WB @ GCR #636057K & BOGGY BRANCH 1.5 MI E OF MACON

Sector: Bridge • Location: Macon, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The project PI 0019935, existing just inside the eastern Macon City limits, proposes replacement of the I-16 EB and WB bridges over GCR and Boggy Branch in Bibb County, GA. A single bridge with two 12-ft travel lanes in each direction, 12-ft outside shoulder in the eastbound direction and 14-ft outside shoulder in the westbound direction and a 64-ft barrier divided median between directions of tra

Project Information FAQ

Project Information

3 Q
The project “I-16 EB & WB @ GCR 636057K & BOGGY BRANCH 1.5 MI E OF MACON” is an infrastructure initiative in the Bridge sector, located in Macon, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project PI 0019935, existing just inside the eastern Macon City limits, proposes replacement of the I-16 EB and WB bridges over GCR and Boggy Branch in Bibb County, GA. A single bridge with two 12-ft travel lanes in each direction, 12-ft outside shoulder in the eastbound direction and 14-ft outside shoulder in the westbound direction and a 64-ft barrier divided median between directions of travel. The proposed roadway approaches will consist of two 12-ft lanes in each direction, with 14-ft outside shoulders 12-ft inside shoulders, and a 64-ft depressed grass median. The outside fill slopes will be protected entirely with guardrail and/or concrete barrier for the full length of project and will tie to existing guardrail. The total project length including staging tapers is approximately 1.01 miles.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data