logo

I-20 @ I-520 INTERCHANGE RECONSTRUCTION

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project consists of improvements to I-520/Bobby Jones Expressway from north of Scott Nixon Memorial Drive to south of Wheeler Road, a distance of 1.9 miles. The Bobby Jones Expressway/Scott Nixon Mem. Drive intersection will be reconstructed to provide a grade separated interchange with full access between Bobby Jones Expressway and Scott Nixon Mem. Drive. The I-520/I-20 Interchange will be i

Status
Under Construction
Sector
Bridge, Road, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about I-20 @ I-520 INTERCHANGE RECONSTRUCTION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-20 @ I-520 INTERCHANGE RECONSTRUCTION” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of improvements to I-520/Bobby Jones Expressway from north of Scott Nixon Memorial Drive to south of Wheeler Road, a distance of 1.9 miles. The Bobby Jones Expressway/Scott Nixon Mem. Drive intersection will be reconstructed to provide a grade separated interchange with full access between Bobby Jones Expressway and Scott Nixon Mem. Drive. The I-520/I-20 Interchange will be improved by replacing two loop ramps with directional flyover ramps for I-520 northbound to I-20 westbound and for I-20 westbound to I-520 southbound. A pair of collector-distributor roadways will be added adjacent to I-520 from south of the I-20 interchange to south of Wheeler Road. I-20 will be widened to a six-lane facility from east of the Wheeler Road Interchange to east of Walton Way Extension/Davis Road, a distance of 2.4 miles. An eastbound collector-distributor lane will be added adjacent to I-20 from west of the I-520 Interchange to just east of Walton Way Extension/Davis Road.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road, Government

Article published date

2024-03-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project