I-20 @ I-520 INTERCHANGE RECONSTRUCTION
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project consists of improvements to I-520/Bobby Jones Expressway from north of Scott Nixon Memorial Drive to south of Wheeler Road, a distance of 1.9 miles. The Bobby Jones Expressway/Scott Nixon Mem. Drive intersection will be reconstructed to provide a grade separated interchange with full access between Bobby Jones Expressway and Scott Nixon Mem. Drive. The I-520/I-20 Interchange will be i
- Status
- Under Construction
- Sector
- Bridge, Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about I-20 @ I-520 INTERCHANGE RECONSTRUCTION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of improvements to I-520/Bobby Jones Expressway from north of Scott Nixon Memorial Drive to south of Wheeler Road, a distance of 1.9 miles. The Bobby Jones Expressway/Scott Nixon Mem. Drive intersection will be reconstructed to provide a grade separated interchange with full access between Bobby Jones Expressway and Scott Nixon Mem. Drive. The I-520/I-20 Interchange will be improved by replacing two loop ramps with directional flyover ramps for I-520 northbound to I-20 westbound and for I-20 westbound to I-520 southbound. A pair of collector-distributor roadways will be added adjacent to I-520 from south of the I-20 interchange to south of Wheeler Road. I-20 will be widened to a six-lane facility from east of the Wheeler Road Interchange to east of Walton Way Extension/Davis Road, a distance of 2.4 miles. An eastbound collector-distributor lane will be added adjacent to I-20 from west of the I-520 Interchange to just east of Walton Way Extension/Davis Road. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2024-03-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- Centennial Bridge
- Claflin University Connecting Minority Community Project
- ConnectMaine Authority Statewide Broadband Infrastructure Application 2021
- White Earth NTIA Broadband – White Earth Reservation
- Tri-State Fiber Deployment Project (TSFDP)
- OLLU Connecting Minority Communities Pilot
- Strengthening Broadband Capacity to Amplify Educational Opportunities and Foster Digital Inclusion in Rural and Underserved Communities
- Connecting Minds & Technology: Enhancing Cross-Campus Digital Literacy with Hands-on Initiatives (CMT)
