I-20 @ SR 1/US 27 INTERCHANGE - LIGHTING
Sector: Power Generation (CCGT) • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This Force Account project consists of the installation of 15 - 100' high mast light towers with 116 - 400 Watt high pressure sodium luminaires. The underpass is proposed to be lighted with 4 - 150 Watt high pressure sodium luminaires. Four electrical service points will be required to power the system. The Department is responsible for the cost of materials only ($339,051.23 estimate dated 9/2
- Status
- Closed
- Sector
- Power Generation (CCGT), Tunnel, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about I-20 @ SR 1/US 27 INTERCHANGE - LIGHTING
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Force Account project consists of the installation of 15 - 100' high mast light towers with 116 - 400 Watt high pressure sodium luminaires. The underpass is proposed to be lighted with 4 - 150 Watt high pressure sodium luminaires. Four electrical service points will be required to power the system. The Department is responsible for the cost of materials only ($339,051.23 estimate dated 9/26/2007). The City of Bremen is responsible for the design, installation, energy, maintenance and operation costs. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Tunnel, Government |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
