logo

I-20 JUST EAST OF DAVIS ROAD - DRAINAGE IMPRVS @ CRANE CREEK

Sector: Advanced Electronics • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project is located entirely in Richmond County, Georgia. It consists of improvements to the existing culvert conveying Crane's Creek under I-20 and raising the grade of the interstate highway to prevent flooding of the roadway. Improvements to the culvert include construction of an overflow weir box on the inlet end so that the weir simulates the existing weir flow over the existing I-20 pr

Project Information FAQ

Project Information

4 Q
The project “I-20 JUST EAST OF DAVIS ROAD - DRAINAGE IMPRVS @ CRANE CREEK” is an infrastructure initiative in the Advanced Electronics sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is located entirely in Richmond County, Georgia. It consists of improvements to the existing culvert conveying Crane's Creek under I-20 and raising the grade of the interstate highway to prevent flooding of the roadway. Improvements to the culvert include construction of an overflow weir box on the inlet end so that the weir simulates the existing weir flow over the existing I-20 profile; and, three additional box culvert barrels to accommodate the overflow. Improvements to the roadway include raising the profile grade to an elevation, which provides one foot of freeboard between the 100-year storm elevation and the bottom of the subgrade of the roadway. Also, the interstate will be widened to match the typical section of I-20 as proposed for the adjacent project at the I-20/I-520 Interchange. The typical section is three 12' lanes each direction with 28' median and median barrier and 12' outside paved shoulders with side ditches.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data