logo

I-20 Lindale from Harvey Rd. (CR 433) east to US 69

Sector: Bridge • Location: United States of America (USA)

Source: Texas Department of Transportation (TxDOT)

Project

The Texas Department of Transportation's Tyler District is developing plans to widen and reconstruct I-20 from Harvey Rd. (CR 433) east to US 69, in Smith County. The proposed project would widen and reconstruct I-20 mainlanes, construct one-way frontage roads, reconstruct ramps, replace mainlane and frontage road bridges over Prairie Creek, and realign Wood Springs Road. This 2-mile segment is pa

Project Information FAQ

Project Information

3 Q
The project “I-20 Lindale from Harvey Rd. (CR 433) east to US 69” is an infrastructure initiative in the Bridge sector, located in United States of America (USA). Taiyo aggregates data on it from Texas Department of Transportation (TxDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Texas Department of Transportation's Tyler District is developing plans to widen and reconstruct I-20 from Harvey Rd. (CR 433) east to US 69, in Smith County. The proposed project would widen and reconstruct I-20 mainlanes, construct one-way frontage roads, reconstruct ramps, replace mainlane and frontage road bridges over Prairie Creek, and realign Wood Springs Road. This 2-mile segment is part of Tyler District’s I-20 corridor expansion project. The population in Smith County increased 11.3% between 2010 and 2020, from 209,714 to 233,479 respectively. During that same timeframe, the population of Lindale increased 20.4%, from 4,818 to 6,059; and the population of Tyler increased 9.3%, from 96,900 to 105,995. Average daily traffic (ADT) along I-20 mainlanes through the project area in 2021 was 51,020 and is projected to increase more than 36% from 2027 to 2047. Approximately 32% of ADT throughout the project area is attributed to truck traffic.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data