I-215 West Improved Project
The owner, status and timeline of this project. A free account opens every field.
Source: UDOT (.gov)
The I-215 West Improved project involves repaving multiple sections of I-215, replacing 18 bridge decks, and repairing 12 additional bridges. The project began in summer 2025 and is scheduled to be completed in late summer 2027. Current work includes ramp closures and paving, barrier replacement, and restriping at the I-80 to I-215 interchange.
- Status
- Under Construction
- Sector
- Bridge
- Location
- Salt Lake City, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- UDOT (.gov)
ConstructChat
Ask ConstructChat about I-215 West Improved Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The I-215 West Improved project involves repaving multiple sections of I-215, replacing 18 bridge decks, and repairing 12 additional bridges. The project began in summer 2025 and is scheduled to be completed in late summer 2027. Current work includes ramp closures and paving, barrier replacement, and restriping at the I-80 to I-215 interchange. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Utah |
City | Salt Lake City |
Source
Source | UDOT (.gov) |
URL |
More Details
Record type | Project |
Sector | Bridge |
Article published date | 2026-07-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project