logo
ProjectUnder Construction

I-24 Bridge Replacement at Exit 105

The owner, status and timeline of this project. A free account opens every field.

Source: 3B Media News

Phase 2 of I-24 bridge replacement at Exit 105 in Coffee County. SR-2 reduced to one lane with traffic signal system. Temporary lane closures on I-24 for bridge painting activities scheduled from September 10 to September 12, 2025, nightly from 7 PM to 6 AM.

Status
Under Construction
Sector
Road, Bridge, Government
Location
Tullahoma, Tennessee, United States of America
Updated
22 Jul 2026
Source
3B Media News

ConstructChat

Ask ConstructChat about I-24 Bridge Replacement at Exit 105

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-24 Bridge Replacement at Exit 105” is an infrastructure initiative in the Road sector, located in Tullahoma, Tennessee, United States. Taiyo aggregates data on it from 3B Media News.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 2 of I-24 bridge replacement at Exit 105 in Coffee County. SR-2 reduced to one lane with traffic signal system. Temporary lane closures on I-24 for bridge painting activities scheduled from September 10 to September 12, 2025, nightly from 7 PM to 6 AM.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Tennessee

City

Tullahoma

Source

Source

3B Media News

URL

More Details

Record type

Project

Sector

Road, Bridge, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project