logo
ProjectStudy And Design

I-25 Raton/Clayton Interchange Study (US Highway 64/87)

The status, timeline and source of this project. A free account opens every field.

Source: New Mexico Department of Transportation (NMDOT)

CN 4101691 District 4 Colfax County

The I-25 interchange at US Highway 64/87 serves as one of three access points to the City of Raton, but also connects to the US 64/87 Highway. This highway provides access to communities in northeast New Mexico as well as regional connectivity for the nation's transportation system. A new bridge with a tight diamond interchange was selected as the preferred al

Status
Prospective
Sector
Road, Bridge
Location
United States of America
Updated
19 Nov 2026
Source
New Mexico Department of Transportation (NMDOT)

ConstructChat

Ask ConstructChat about I-25 Raton/Clayton Interchange Study (US Highway 64/87)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “I-25 Raton/Clayton Interchange Study (US Highway 64/87)” is an infrastructure initiative in the Road sector, located in United States. Taiyo aggregates data on it from New Mexico Department of Transportation (NMDOT).

Participants

Not available for this record.

Status

Original status

study and design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

CN 4101691 District 4 Colfax County The I-25 interchange at US Highway 64/87 serves as one of three access points to the City of Raton, but also connects to the US 64/87 Highway. This highway provides access to communities in northeast New Mexico as well as regional connectivity for the nation's transportation system. A new bridge with a tight diamond interchange was selected as the preferred alternative. This alternative involves full reconstruction of the interchange, utilizing a tight diamond configuration that allows for full lane widths along with bike and pedestrian facilities crossing I-25 via a new bridge. The tight diamond configuration removes the existing loop ramp and provides for adequate spacing between the frontage road system and interstate ramps. Preliminary design has been completed (30% Design) and design efforts are continuing. A bridge aesthetic plan that will involve public and stakeholder input is also ongoing.

Original sector

Transportation

Location

Country

United States of America (USA)

Source

Source

New Mexico Department of Transportation (NMDOT)

URL

More Details

Record type

Project

Sector

Road, Bridge

Article published date

2026-11-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project