logo
ProjectUnder Construction

I-280 Westbound Bridge Deck Replacement Project

The owner, status and timeline of this project. A free account opens every field.

Source: Patch

A $31.7 million federally funded project to replace the I-280 westbound bridge decks on the 10-span viaduct over NJ Transit tracks, Orange Street, and 1st Street in Newark. The project includes substructure repairs, replacing bearings, repairing structural steel, repainting portions of the bridge, replacing the retaining wall on the ramp from 1st Street to I-280 westbound to allow three through la

Status
Under Construction
Sector
Road, Bridge, Steel, Government, Metal
Location
Newark, New Jersey, United States of America
Updated
22 Jul 2026
Source
Patch

ConstructChat

Ask ConstructChat about I-280 Westbound Bridge Deck Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “I-280 Westbound Bridge Deck Replacement Project” is an infrastructure initiative in the Road sector, located in Newark, New Jersey, USA. Taiyo aggregates data on it from Patch.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A $31.7 million federally funded project to replace the I-280 westbound bridge decks on the 10-span viaduct over NJ Transit tracks, Orange Street, and 1st Street in Newark. The project includes substructure repairs, replacing bearings, repairing structural steel, repainting portions of the bridge, replacing the retaining wall on the ramp from 1st Street to I-280 westbound to allow three through lanes, and installing two new overhead sign structures over I-280. The project is designed to advance in stages to minimize motorist impact and is expected to be completed by the end of 2025.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

New Jersey

City

Newark

Source

Source

Patch

URL

More Details

Record type

Project

Sector

Road, Bridge, Steel, Government, Metal

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project