logo

I-285 @ BOULDERCREST ROAD

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

The project will include a CD roadway system between the I-675/I-285 interchange and the I-285/Bouldercrest Road interchange. On Bouldercrest Road, the project will extend from approximately 220’ south of Sugar Creek Golf Drive to approximately 525’ north of Continental Way. On I-285, the project would extend from the I-675 northbound exit ramp bridge over I-285 to just west of the I-285 bridge o

Status
Under Construction
Sector
Bridge, Car parking, Road, Government, Automotive
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about I-285 @ BOULDERCREST ROAD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-285 @ BOULDERCREST ROAD” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will include a CD roadway system between the I-675/I-285 interchange and the I-285/Bouldercrest Road interchange. On Bouldercrest Road, the project will extend from approximately 220’ south of Sugar Creek Golf Drive to approximately 525’ north of Continental Way. On I-285, the project would extend from the I-675 northbound exit ramp bridge over I-285 to just west of the I-285 bridge over Sugar Creek. The reconstruction of the I-285/Bouldercrest Road interchange will require replacing the existing Bouldercrest Road bridge over I-285. The new bridge will have six 12-foot travel lanes (two southbound through lanes, two southbound left-turn lanes and two northbound through lanes), 6-foot sidewalks on both sides and 4-foot wide bicycle lanes on both sides. North of the interchange, Bouldercrest Road will transition to the existing 5-lane section north of Continental Way.

Location

Country

United States of America (USA)

State

Georgia

Source

Source reliability

High

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Car parking, Road, Government, Automotive

Article published date

2024-01-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project