I-285 @ SR 141
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
PI# 0017126 will provide dedicated exit lanes and reconfigure the interchange ramps to reduce the bottleneck from I-285 westbound to Peachtree Industrial Boulevard (PIB). The existing single lane westbound exit from I-285 to PIB northbound and southbound will be reconstructed into a two-lane exit facility. To further enhance continuous flow, the existing horizontal curvature of the westbound I-285
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Government
- Location
- Doraville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about I-285 @ SR 141
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PI# 0017126 will provide dedicated exit lanes and reconfigure the interchange ramps to reduce the bottleneck from I-285 westbound to Peachtree Industrial Boulevard (PIB). The existing single lane westbound exit from I-285 to PIB northbound and southbound will be reconstructed into a two-lane exit facility. To further enhance continuous flow, the existing horizontal curvature of the westbound I-285 to northbound PIB exit ramp will be flattened and the access to Flowers Road, a local City of Doraville street, will be eliminated. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Doraville |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
