logo

I-285 @ SR 3

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The proposed project consists of improvements to the intersection of Cobb Pkwy and the I-285 eastbound off-ramp. The I-285 eastbound off-ramp approach currently operates with dual left-turn lanes and triple right-turn lanes. An existing right-turn lane will be converted into a left-turn lane at the I-285 eastbound off-ramp at Cobb Pkwy. The other two existing right-turn lanes will be re-striped an

Status
Closed
Sector
Bridge, Cement, Road, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about I-285 @ SR 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-285 @ SR 3” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project consists of improvements to the intersection of Cobb Pkwy and the I-285 eastbound off-ramp. The I-285 eastbound off-ramp approach currently operates with dual left-turn lanes and triple right-turn lanes. An existing right-turn lane will be converted into a left-turn lane at the I-285 eastbound off-ramp at Cobb Pkwy. The other two existing right-turn lanes will be re-striped and a raised concrete island will be constructed between the right and left turning movements. Additionally, striped pedestrian crosswalks will be provided across Cobb Pkwy and both eastbound ramps. Curb ramps will be constructed within the new island and within the existing concrete median and islands. The northbound lanes along Cobb Pkwy will be restriped under the bridge to ensure that all northbound through lanes are at least 12 feet wide. Additionally, the stop bar striping along the northbound travel lanes will be shifted slightly as a result of the placement of crosswalk striping.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Cement, Road, Government

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project