I-285 @ SR 3
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed project consists of improvements to the intersection of Cobb Pkwy and the I-285 eastbound off-ramp. The I-285 eastbound off-ramp approach currently operates with dual left-turn lanes and triple right-turn lanes. An existing right-turn lane will be converted into a left-turn lane at the I-285 eastbound off-ramp at Cobb Pkwy. The other two existing right-turn lanes will be re-striped an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project consists of improvements to the intersection of Cobb Pkwy and the I-285 eastbound off-ramp. The I-285 eastbound off-ramp approach currently operates with dual left-turn lanes and triple right-turn lanes. An existing right-turn lane will be converted into a left-turn lane at the I-285 eastbound off-ramp at Cobb Pkwy. The other two existing right-turn lanes will be re-striped and a raised concrete island will be constructed between the right and left turning movements. Additionally, striped pedestrian crosswalks will be provided across Cobb Pkwy and both eastbound ramps. Curb ramps will be constructed within the new island and within the existing concrete median and islands. The northbound lanes along Cobb Pkwy will be restriped under the bridge to ensure that all northbound through lanes are at least 12 feet wide. Additionally, the stop bar striping along the northbound travel lanes will be shifted slightly as a result of the placement of crosswalk striping. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America
- Silverado Canyon Road Bridge ( 55C - 0175 ) Replacement
- Modjeska Canyon Road Bridge ( 55C0172 ) Retrofit
- Application of the California Rapid Assessment Method on Strawberry Creek
- Nine Ten Place
- Clinton Keith Extension Project
- Chuckwalla Valley Road Bridge
- Jurupa Grade Separation
- Center St & Stephens Ave Resurfacing
