logo

I-285 @ SR 9 IN SANDY SPRINGS-BRIDGE SAFETY&OPERATIONAL IMP

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This is the PE phase of a project to widen the Roswell Road Bridge over I-285 from five lanes (two through-lanes in both directions and one center lane divided into two very short left-turn lanes) to six lanes (two through-lanes in both directions and two full length left-turn lanes). This extra width will provide dedicated left-turn lanes from Roswell Road to the I-285 entrance ramps in both dire

Project Information FAQ

Project Information

4 Q
The project “I-285 @ SR 9 IN SANDY SPRINGS-BRIDGE SAFETY&OPERATIONAL IMP” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This is the PE phase of a project to widen the Roswell Road Bridge over I-285 from five lanes (two through-lanes in both directions and one center lane divided into two very short left-turn lanes) to six lanes (two through-lanes in both directions and two full length left-turn lanes). This extra width will provide dedicated left-turn lanes from Roswell Road to the I-285 entrance ramps in both directions and accommodate widening the through-lanes from 10 feet to 11 feet. A raised median will be installed in the direct vicinity of the bridge to improve safety and discourage dysfunctional movements. Both I-285 entrance ramps will also be widened from one lane to two lanes before the ramp meter to address the lack of storage. The existing gore location, as well as the number of lanes entering the interstate and the ramp meter timing, will be left unchanged.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data