logo

I-285 FROM COLUMBIA DR TO BOULDER PARK DR - AID UPGRADES

Sector: Cement • Location: Atlanta, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The project proposes to install automated incident detection devices, at 43 existing concrete strain poles and one new concrete strain pole, to upgrade existing video detection systems along I-75, I-85, I-285, and I-675 in Clayton, DeKalb and Fulton Counties. Existing guardrail will be upgraded or extended as needed to meet guardrail warrant guidelines or project requirements.

Status
Under Construction
Sector
Cement, Car parking, Automotive
Location
Atlanta, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about I-285 FROM COLUMBIA DR TO BOULDER PARK DR - AID UPGRADES

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “I-285 FROM COLUMBIA DR TO BOULDER PARK DR - AID UPGRADES” is an infrastructure initiative in the Cement sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project proposes to install automated incident detection devices, at 43 existing concrete strain poles and one new concrete strain pole, to upgrade existing video detection systems along I-75, I-85, I-285, and I-675 in Clayton, DeKalb and Fulton Counties. Existing guardrail will be upgraded or extended as needed to meet guardrail warrant guidelines or project requirements.

Location

Country

United States of America (USA)

State

Georgia

City

Atlanta

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Cement, Car parking, Automotive

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project