I-285 Top End Express Lanes
Sector: Mass Transit • Location: GA, United States of America
Source: US Department of Transportation (USDOT)
Other Agencies with Actions or Authorizations: Georgia Department of the Army, US Army Corps of Engineers - Regulatory Department of the Interior, Fish and Wildlife Service Description: The Federal Highway Administration (FHWA) and Georgia Department of Transportation (GDOT) are preparing an Environmental Impact Statement (EIS) for a proposed highway express lanes (ELs) project along the “top end”
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | paused |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Other Agencies with Actions or Authorizations: Georgia Department of the Army, US Army Corps of Engineers - Regulatory Department of the Interior, Fish and Wildlife Service Description: The Federal Highway Administration (FHWA) and Georgia Department of Transportation (GDOT) are preparing an Environmental Impact Statement (EIS) for a proposed highway express lanes (ELs) project along the “top end” perimeter of Interstate 285 (I-285)/State Route (SR) 407 in the north Atlanta Metropolitan (metro) area. The I-285 Top End Express Lanes project would include barrier-separated ELs along the I-285 top end corridor and SR 400. While studied as one project in the EIS, the project would be constructed in two phases: I-285 Top End West and I-285 Top End East. The I-285 Top End West section would include ELs in both directions from Paces Ferry Road (Exit 18) to SR 400. The I-285 Top End East section would include ELs in both directions from Henderson Road to SR 400, and along SR 400 from south of Glenridge Connector north to the Metropolitan Atlanta Rapid Transit Authority (MARTA) North Springs Station. System-to-system connections are proposed with existing EL systems at I-75 Northwest Corridor (NWC) and at I-85 Express Lanes. Project is part of a larger EL program called the Major Mobility Investment Program (MMIP). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
