I-287/CWE EB TO SMRP NB MSES WALL REPAIR
Sector: Bridge • Location: Town of Greenburgh, New York, United States of America
Source: New York State Department of Transportation (NYSDOT)
In order to address the deficiencies of the Mechanically Stabilized Earth System (MSES) wall ramp, this project will replace the existing ramp that carries Interstate 287 (Cross Westchester Expressway) eastbound to the Saw Mill River Parkway northbound, minimizing required retaining wall systems and eliminating the use of MSE construction methods by incorporating horizontal realignment, new embank
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In order to address the deficiencies of the Mechanically Stabilized Earth System (MSES) wall ramp, this project will replace the existing ramp that carries Interstate 287 (Cross Westchester Expressway) eastbound to the Saw Mill River Parkway northbound, minimizing required retaining wall systems and eliminating the use of MSE construction methods by incorporating horizontal realignment, new embankment sections, and the appropriate types of retaining walls where needed. In addition to the proposed retaining walls that will reinforce the existing MSE walls that support the ramp, an additional wall will be constructed in front of the existing bridge abutment and will connect the proposed walls on both sides of the new ramp. The new retaining walls at the beginning of the proposed full depth reconstruction would reinforce the existing bridge abutment at the end of BIN 1070490 and the existing MSE walls that are to be left in place. This will reduce traffic impacts during construction, eliminate significant excavation and fill costs, and save time during construction. This project is located in the Town of Greenburgh in Westchester County. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
