I-290 Drainage Improvements Project
Sector: Road • Location: Chicago, Illinois, United States
Source: Investing.com Nigeria
The project involves installing 3.3 miles of new trunk sewer with diameters up to 90 inches, constructing new detention systems, and reconstructing one bridge and multiple retaining walls to enhance stormwater management and reduce flooding risks along the Eisenhower Expressway corridor in Chicago.
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Bridge, Waste Processing and Treatment, Government
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Investing.com Nigeria
ConstructChat
Ask ConstructChat about I-290 Drainage Improvements Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves installing 3.3 miles of new trunk sewer with diameters up to 90 inches, constructing new detention systems, and reconstructing one bridge and multiple retaining walls to enhance stormwater management and reduce flooding risks along the Eisenhower Expressway corridor in Chicago. |
Original sector | Infrastructure |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Investing.com Nigeria |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Bridge, Waste Processing and Treatment, Government |
Article published date | 2025-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
