I-294 Tri-State Tollway Entrance Ramp Construction REBID
Sector: Water Supply and Storage • Location: Lisle, Illinois, United States of America
Source: Dodge
The location of services to be performed is the Tri-State Tollway (I-294) between Mile Post 19.4 and Mile Post 20.6 in Cook County, Illinois. The scope of the work shall consist of roadway pavement removal and construction, retaining wall construction, drainage system removal and construction, erosion control, landscaping, roadway lighting, pavement marking, signing, protection and relocation of u
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Automotive, Road, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
- Location
- Lisle, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about I-294 Tri-State Tollway Entrance Ramp Construction REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The location of services to be performed is the Tri-State Tollway (I-294) between Mile Post 19.4 and Mile Post 20.6 in Cook County, Illinois. The scope of the work shall consist of roadway pavement removal and construction, retaining wall construction, drainage system removal and construction, erosion control, landscaping, roadway lighting, pavement marking, signing, protection and relocation of utilities, and maintenance of traffic. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Lisle |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Automotive, Road, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT) |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
