I-295 Bridge Replacement Project
Sector: Road • Location: Smithfield, Rhode Island, United States
Source: WJAR
The project involves the replacement of the Douglas Pike Bridge in Smithfield and the Diamond Hill Road Bridge in Cumberland, which will result in reduced travel lanes on I-295. The Rhode Island Department of Transportation announced that the low-speed lane on each side will be closed, reducing each direction from three lanes to two for approximately 10 months.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Under Construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the replacement of the Douglas Pike Bridge in Smithfield and the Diamond Hill Road Bridge in Cumberland, which will result in reduced travel lanes on I-295. The Rhode Island Department of Transportation announced that the low-speed lane on each side will be closed, reducing each direction from three lanes to two for approximately 10 months. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
